Project archive

Six jobs, with the awkward parts left in

Every one of these had something that did not go to plan: a historic review cycle, a flood-zone threshold, a slab reading nobody wanted, a service that could not carry the house. That is the interesting part, so it is the part we wrote down.

Projects shown
6
Range of budgets
$96k to $412k
Durations
14 to 38 weeks

Budgets and durations shown are sample figures for this demo site.

On site

The parts of a renovation nobody photographs

  • Zip-wall containment and a sealed return, day one
    Zip-wall containment and a sealed return, day one
  • Beam pocket cut, shoring in, before the steel goes up
    Beam pocket cut, shoring in, before the steel goes up
  • Slab ground flat before the levelling compound
    Slab ground flat before the levelling compound
  • Rough-in walked with the inspector's list in hand
    Rough-in walked with the inspector's list in hand
  • Blocking for grab bars, installed while the wall is open
    Blocking for grab bars, installed while the wall is open
  • Flood test sitting in a shower pan, recorded before tile
    Flood test sitting in a shower pan, recorded before tile
  • Impact unit label left on for the final inspection
    Impact unit label left on for the final inspection
  • Punch walk, raking light, the last four items
    Punch walk, raking light, the last four items

Your house will have its own awkward part

We would rather find it in week one, when it is still cheap to solve.