Jacksonville, Florida

We renovate whole houses, and we answer the hard questions first.

Additions, structural openings, bonus rooms, floors, paint and outdoor living across Duval, Clay and St. Johns counties. Kitchens and baths appear here as rooms inside a bigger plan.

Mandarin, 1974 ranch

Drag the handle

A 1974 Mandarin ranch before renovation, with a bearing wall closing off the front rooms
The same house after 22 feet of bearing wall was removed and one floor was run through
BeforeAfter
  • 22 ft of bearing wall out, flush engineered beam in
  • Two new footings poured through the slab and inspected
  • Slab read 91 percent RH, so the floor got a moisture barrier

What you get first

A two hour site visit, and a band you can plan against

  • Panel photographed and a load calculation run
  • Air handler, duct and attic looked at properly
  • Slab screened for moisture where flooring is in scope
  • Written budget band inside a week, no drawings, no deposit

They told us about the historic review in the first meeting instead of after we had paid for drawings. That one thing saved us months.

Priya Raghunathan, Avondale
Licensed GCFully insured2 yr workmanship

FL CGC #1500000 (sample placeholder, not a real licence number)

Load calculation first

Before design, not at rough-in. It is the cheapest twenty minutes in the project.

Slab readings in writing

In-situ relative humidity probes before any flooring is ordered. You keep the numbers.

One superintendent

Same person start to finish, on your job every working day, Friday photo update.

Fixed price, named products

A written selections schedule with part numbers and lead times. No invisible allowances.

What we build

Eight scopes, one contract

All services and detail pages

We are a general renovation firm. Kitchens and bathrooms appear here as two rooms among eight, because on the jobs we take they are usually one part of a larger plan.

  • Whole-home renovation

    Every room on one schedule, one contract and one superintendent.

    26 to 44 weeks on site

  • Home additions

    Ground-floor bump-outs, rear additions and second-storey square footage.

    18 to 34 weeks on site

  • Basement and bonus room finishing

    Below-grade rooms, over-garage bonus rooms and enclosed under-house space.

    10 to 18 weeks on site

  • Flooring and subfloor prep

    Slab moisture testing, flatness correction and transitions that do not trip anyone.

    4 to 15 working days

  • Interior painting

    Drywall repair, correct primer, and a finish schedule written per room.

    5 to 14 working days

  • Decks and outdoor living

    Screened lanais, decks, pergolas and summer kitchens built for coastal exposure.

    6 to 14 weeks on site

  • Kitchen remodeling

    One room inside a wider plan, sequenced with the rest of the house.

    9 to 16 weeks on site

  • Bathroom remodeling

    Usually paired with a wider scope, with waterproofing done properly.

    5 to 10 weeks on site

By the numbers

Fifteen years of
Duval County houses

  • 214Permitted renovations closed out since 2011
  • 97%Jobs finished inside the contract schedule (sample figure)
  • 31Service upgrades caught at design instead of rough-in, last two years
  • 2 yrWorkmanship warranty, plus 60 day and 11 month return visits

Figures shown are sample content for this demo site.

See the jobs behind the numbers

Project archive

Six jobs, with the awkward parts left in

Open the full archive

Budget and duration figures are sample content. Drag, swipe or use the arrows.

Where we work

Six areas, and what each one costs you in paperwork

The housing stock changes every few miles here, and so does the review process. Open an area to see what it does to a renovation.

Jacksonville's oldest intact residential neighbourhoods, and the ones where a renovation is as much a paperwork exercise as a carpentry one.

Historic review. Much of Riverside and Avondale sits inside a locally designated historic district. Exterior changes visible from the street, including windows, siding and porch details, go through a certificate of appropriateness before a building permit is issued. Budget four to ten weeks for that review and design to it from the start.

What we build in Riverside and Avondale

Masonry bungalows and mid-century ranches close to the river, where flood zone and elevation questions come before design questions.

Flood zone and the 50 percent rule. Parts of San Marco are in a mapped special flood hazard area. When a renovation's cost reaches 50 percent of the structure's market value, the whole building has to be brought into compliance, which can mean elevating it. We check the flood map and the assessed structure value before any design work.

What we build in San Marco

Slab-on-grade ranches and two-storey colonials from the 1970s through the 1990s, most of them due for their first real renovation.

Slab moisture. Mandarin slabs from the 1970s often sit directly on sand with no vapour retarder. We test relative humidity in the slab before specifying any resilient or wood flooring, every time.

What we build in Mandarin

Coastal exposure changes the hardware, the openings and the maintenance conversation on every job.

Wind-borne debris region. Beach properties sit in the wind-borne debris region, so every glazed opening must be either impact-rated or protected by an approved shutter system. That is a design decision with a real cost, and it belongs in the first conversation.

What we build in Jacksonville Beach

Larger houses, higher finish levels, and an architectural review board in front of nearly every exterior change.

Architectural review. Most communities here require ARB approval for exterior changes before the county will issue a permit, and several restrict working hours and contractor parking. We prepare the submission package and track it, and we plan four to eight weeks for the review.

What we build in Ponte Vedra Beach

Practical family renovations, garage conversions and additions on generous suburban lots.

Clay County permitting. A separate jurisdiction from Duval with its own submittal requirements and inspection scheduling. We are licensed and set up to file there.

What we build in Orange Park
Houses in Riverside and Avondale, Duval CountyRiverside and Avondale · Duval County
Houses in San Marco, Duval CountySan Marco · Duval County
Houses in Mandarin, Duval CountyMandarin · Duval County
Houses in Jacksonville Beach, Duval CountyJacksonville Beach · Duval County
Houses in Ponte Vedra Beach, St. Johns CountyPonte Vedra Beach · St. Johns County
Houses in Orange Park, Clay CountyOrange Park · Clay County

Current offers

Three things we will do before you commit

  • Pre-design house survey

    A two hour visit covering the electrical panel and a 220.83 load check, slab moisture screening in two rooms, an attic and duct look, and a written summary of what your house will need before anyone draws a plan.

    No charge on scopes over $75,000 (sample offer)

    One visit per property. Inside our six service areas. Booked through the estimate form.

    Sample offer, shown for demonstration only

  • Slab moisture testing credit

    Book flooring over 1,200 square feet and the in-situ relative humidity testing is credited against the contract. You keep the written readings whether or not you go ahead with us.

    Up to $650 credited (sample offer)

    Slab-on-grade only. Testing follows the manufacturer's schedule and cannot be rushed.

    Sample offer, shown for demonstration only

  • Off-peak scheduling

    Interior scopes that mobilise between the second week of January and the end of February are quoted at our off-peak labour rate. Fewer weather delays on interior work, and our crews are not competing with the spring rush.

    3 to 5 percent off the labour line (sample offer)

    Interior scopes only. Contract signed by 20 December. Cannot be combined with the slab testing credit.

    Sample offer, shown for demonstration only

Before you design

Will the panel carry the house you want?

This runs the optional demand calculation the code uses for an existing dwelling: everything is added up, the first 8,000 volt-amperes counts in full, the rest counts at 40 percent, and the mechanical load is added afterwards at its full value.

Fastened-in-place appliances
  • Nameplate rating. A 36 inch or double unit runs higher.

  • A heat-pump dryer draws far less and can share a 120 volt circuit.

  • Tankless electric units are a different conversation entirely.

  • Dedicated circuit required.

  • Usually shares the kitchen area but on its own circuit.

  • Dedicated circuit when it is built in.

  • Common in a whole-home renovation and often the load that tips a panel.

  • Three 40 amp double-pole circuits is typical. This changes the answer on its own.

  • A continuous load. Load management hardware can reduce the calculated demand.

  • Variable-speed pumps draw less than the old single-speed units.

  • Only on properties not served by city water.

Calculated demand

0.0 A

Connected load
0 VA
After demand factors
0 VA

Orientation only. A permit set needs a calculation by a licensed electrical contractor or engineer on your actual plan, and local amendments apply.

The full electrical guide

Before you add square footage

Adding a room changes the load, not just the thermostat

In a hot-humid climate a large part of the cooling job is removing moisture. This works out both halves for the area you are adding, so the conversation with your mechanical contractor starts from a number.

This is an orientation figure, not a Manual J. A real calculation is done room by room on the finished plan and accounts for infiltration, duct location, internal gains and shading.

Estimated cooling load

1.5 tons

Sensible
0 BTU/h
Latent, moisture removal
0 BTU/h
Total
0 BTU/h
Design airflow
0 CFM
Works out at
0 sq ft per ton

Why bigger equipment makes it worse

Before you order glass

Every opening has its own number

Design pressure is not a property of the house, it is a property of each opening: its exposure, its height above grade and whether it sits in the field of the wall or inside the corner zone. Ordering one rating for a whole house is how units end up under-rated exactly where the wind is worst.

Positive pressure

+30 to +38 psf

Negative, suction

-33 to -42 psf

Exposure
Exposure B, suburban with surrounding buildings and trees
Zone
Zone 4, away from corners
Impact requirement
Impact rating not required outside the wind-borne debris region, but check the map for your address before assuming.

The least demanding case we see, and the one people wrongly assume applies everywhere.

Positive pressure

+30 to +38 psf

Negative, suction

-41 to -55 psf

Exposure
Exposure B
Zone
Zone 5, within the corner width of the wall
Impact requirement
Same as the field case for impact, but the suction rating is materially higher.

Corner zones always carry higher suction. Ordering one rating for a whole house is how units end up under-rated at the corners.

Positive pressure

+42 to +55 psf

Negative, suction

-46 to -62 psf

Exposure
Exposure C or D, open terrain or facing open water
Zone
Zone 4
Impact requirement
Impact-rated glazing or an approved shutter system is required in the wind-borne debris region.

Exposure category alone can move the required pressure by 30 percent or more.

Positive pressure

+42 to +55 psf

Negative, suction

-58 to -78 psf

Exposure
Exposure C or D
Zone
Zone 5
Impact requirement
Impact-rated, and the large-missile test level applies below 30 feet above grade.

The most demanding common case in our service area, and the one that drives the unit schedule.

Positive pressure

+28 to +45 psf

Negative, suction

-31 to -50 psf

Exposure
Any
Zone
Large opening, treated as its own case
Impact requirement
A failed garage door pressurises the house from inside and is a common path to losing a roof.

The largest opening in most houses and the most frequently left at the original 1980s rating.

Pressure ranges shown are illustrative for a Jacksonville area house in Risk Category II. The real figures come from a calculation for your address, your building height and your exposure category, and they belong on the permit set.

Product approval, NOA and DP ratings explained

Before you buy flooring

The floor fails at the substrate, not the plank

Pick what you want to lay and this shows what the slab has to test at, how flat it has to be, and how thick the finished assembly is, which is what decides every doorway in the house.

Flatness required
3/16 in. in 10 ft
Slab moisture limit
Commonly 85 to 90 percent RH limit, or 3 lb calcium chloride
Substrate
Slab on grade or plywood
Underlayment
Attached pad or a separate 1 to 1.5 mm pad

Finished build-up

6 to 8 mm plus pad

Relative to carpet with pad, the thickest common assembly on this list.

Forgiving on moisture, unforgiving on flatness. Long planks telegraph every dip in a slab.

Flatness required
1/8 in. in 10 ft
Slab moisture limit
Adhesive-dependent, often 85 percent RH
Substrate
Slab on grade
Underlayment
None, adhesive direct to prepared slab

Finished build-up

2.5 to 5 mm

Relative to carpet with pad, the thickest common assembly on this list.

The flattest substrate requirement of the resilient products, and the thinnest build-up at a doorway.

Flatness required
3/16 in. in 10 ft
Slab moisture limit
Typically 75 to 80 percent RH limit
Substrate
Slab with a barrier, or plywood
Underlayment
Vapour retarder or moisture-control adhesive

Finished build-up

9 to 15 mm

Relative to carpet with pad, the thickest common assembly on this list.

The tightest moisture limit of the common products. Test the slab before you order it, not after.

Flatness required
1/4 in. in 10 ft
Slab moisture limit
Tolerant, but movement joints are mandatory
Substrate
Slab, backer board or an uncoupling membrane
Underlayment
Uncoupling or crack-isolation membrane over slab

Finished build-up

8 to 10 mm plus 6 mm mortar

Relative to carpet with pad, the thickest common assembly on this list.

Moisture-tolerant, which makes it the usual answer on a slab that tests high.

Flatness required
1/8 in. in 10 ft
Slab moisture limit
Tolerant, with movement joints
Substrate
Levelled slab or membrane
Underlayment
Uncoupling membrane, often required by warranty

Finished build-up

10 to 12 mm plus 8 mm mortar

Relative to carpet with pad, the thickest common assembly on this list.

The tightest flatness requirement on this list, and the reason self-levelling underlayment dominates large-format budgets.

Flatness required
3/8 in. in 10 ft
Slab moisture limit
Tolerant, but moisture under carpet grows odour
Substrate
Slab or plywood
Underlayment
Separate pad

Finished build-up

10 to 14 mm plus 8 mm pad

Relative to carpet with pad, the thickest common assembly on this list.

The most forgiving product and the thickest build-up, which is what makes carpet-to-tile doorways awkward.

Transition heights and preparation order

Financing

Three ways our clients pay for this

How the draw schedule works
  • Project loan

    Unsecured, fastest to close

    $1,062per month, sample

    60 months on $50,000 · Sample APR 9.99 percent

    Typical amount
    $15,000 to $100,000
    Term
    60 or 144 months
    • No lien against the house
    • Decision usually inside a few business days
    • No appraisal and no draw schedule
    • Fixed rate for the whole term

    Watch for: The rate is higher than a secured product because the lender has no collateral. Best when the amount is modest and speed matters.

    Single-scope work: flooring, painting, a bathroom, a deck.

  • Most used on our jobs

    Home equity line

    Draw what the schedule needs

    $1,020per month, sample

    Interest only on $150,000 during draw · Sample variable APR 8.25 percent

    Typical amount
    $25,000 to $250,000
    Term
    10 year draw, 20 year repayment
    • Pay interest only on what is drawn
    • Draw against the construction schedule
    • Appraisal and title work required
    • Secured by the property

    Watch for: The rate is usually variable, so a long project carries rate risk. Ask the lender what the lifetime cap is.

    Whole-home renovations and additions where costs land in stages.

  • Renovation mortgage

    Borrow against the finished value

    $1,827per month, sample

    180 months on $200,000 · Sample APR 7.25 percent

    Typical amount
    $50,000 to $500,000
    Term
    180 or 360 months
    • Underwritten on the after-renovation value
    • Contractor draw schedule and inspections
    • Can be combined with the purchase
    • Fixed rate available

    Watch for: The slowest to close and the most paperwork, including a lender-approved scope and budget. Start it before design is finished, not after.

    Large scopes, and houses bought specifically to renovate.

  • Project loan

    Unsecured, fastest to close

    $583per month, sample

    144 months on $50,000 · Sample APR 9.99 percent

    Typical amount
    $15,000 to $100,000
    Term
    60 or 144 months
    • No lien against the house
    • Decision usually inside a few business days
    • No appraisal and no draw schedule
    • Fixed rate for the whole term

    Watch for: The rate is higher than a secured product because the lender has no collateral. Best when the amount is modest and speed matters.

    Single-scope work: flooring, painting, a bathroom, a deck.

  • Most used on our jobs

    Home equity line

    Draw what the schedule needs

    $638per month, sample

    Amortised on $100,000 in repayment · Sample variable APR 8.25 percent

    Typical amount
    $25,000 to $250,000
    Term
    10 year draw, 20 year repayment
    • Pay interest only on what is drawn
    • Draw against the construction schedule
    • Appraisal and title work required
    • Secured by the property

    Watch for: The rate is usually variable, so a long project carries rate risk. Ask the lender what the lifetime cap is.

    Whole-home renovations and additions where costs land in stages.

  • Renovation mortgage

    Borrow against the finished value

    $1,364per month, sample

    360 months on $200,000 · Sample APR 7.25 percent

    Typical amount
    $50,000 to $500,000
    Term
    180 or 360 months
    • Underwritten on the after-renovation value
    • Contractor draw schedule and inspections
    • Can be combined with the purchase
    • Fixed rate available

    Watch for: The slowest to close and the most paperwork, including a lender-approved scope and budget. Start it before design is finished, not after.

    Large scopes, and houses bought specifically to renovate.

Every payment figure on this page is a sample calculation at the stated sample rate and term. It is not an offer or a quote. We are not a lender, we do not broker loans and we take no referral fee.

On site

The parts of a renovation nobody photographs

  • Zip-wall containment and a sealed return, day one
    Zip-wall containment and a sealed return, day one
  • Beam pocket cut, shoring in, before the steel goes up
    Beam pocket cut, shoring in, before the steel goes up
  • Slab ground flat before the levelling compound
    Slab ground flat before the levelling compound
  • Rough-in walked with the inspector's list in hand
    Rough-in walked with the inspector's list in hand
  • Blocking for grab bars, installed while the wall is open
    Blocking for grab bars, installed while the wall is open
  • Flood test sitting in a shower pan, recorded before tile
    Flood test sitting in a shower pan, recorded before tile
  • Impact unit label left on for the final inspection
    Impact unit label left on for the final inspection
  • Punch walk, raking light, the last four items
    Punch walk, raking light, the last four items

One review, in full

Another builder quoted us a bigger plan and never mentioned the flood rule. HomeRise brought it up before we spent a dollar on design, then built the version that got permitted.

Elena Brooks, San Marco

Elena Brooks

San Marco · 620 sq ft rear addition in an AE flood zone · November 2024

  • 4.9 average from 186 reviews
  • Licensed and insured general contractor
  • Fixed price against a written selections schedule

Sample rating and review count shown for demonstration.

Read all reviews
A superintendent walking a renovation with the drawings in handWalk the seven stages

How we work

The job runs on three documents

See the full process
  • A written phase map in week two

    Dust level, noise window, what goes offline and the decision you owe us, phase by phase.

  • One superintendent, start to finish

    Same person from mobilisation to the 11 month return visit. Walks the job every working day.

  • Photographed before it is covered

    Rough-in, blocking, flashing and flood tests recorded, because you cannot check them later.

A renovation is a sequence of decisions, and almost all of the expensive ones are made before anybody swings a hammer.

So we front-load them. The panel gets a load calculation, the slab gets a moisture reading, the wall you want removed gets an engineer, and the openings get a pressure number, all before there is a contract to sign. It makes the first three weeks slower and the next thirty faster.

We are not the cheapest bid you will get, and we are not trying to be. What we are is the firm that told you about the flood rule, the historic review and the 91 percent slab in week one, when those things were still free to solve.

Rosa Villareal, founder

Start with a free estimate

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.