What we build

Kitchen remodeling

One room inside a wider plan, sequenced with the rest of the house.

Typical range
$58,000 to $145,000
On site
9 to 16 weeks on site
Contract
Fixed price

Get a free estimate

Kitchen remodeling

Overview

What this scope actually is

We are a whole-home renovation firm, and kitchens reach us as one room inside a larger scope: a wall comes out, the service is upgraded, the floor runs through, and the kitchen is the room where all three meet.

If a standalone kitchen is genuinely all you want, a kitchen-only specialist may serve you better and we will say so. Where we are the right fit is when the kitchen work touches structure, electrical capacity, mechanical layout or a floor that continues into the rest of the house.

The technical questions we own are the ones that cross room boundaries: can the panel carry the new appliance load, does the wall you want removed carry the roof, and will the new floor height work at every doorway.

Included

What is in the contract

  • Structural check

    Any wall removal engineered with a header or beam and a drawn load path, because a kitchen wall in a 1960s ranch is often a bearing wall.

  • Load calculation

    A NEC 220.83 check before we commit to an induction range, a second oven or a dedicated circuit list.

  • Ventilation

    Hood airflow matched to the cooking appliance and, where the exhaust rate requires it, a make-up air path so the house is not depressurised.

  • Plumbing moves

    On slab houses, any drain relocation is a slab cut priced honestly rather than hidden in an allowance.

  • Cabinetry and millwork

    Semi-custom or custom, measured after the walls are true, with a written schedule of every box and every modification.

  • Surfaces

    Templated after cabinets are set, not before, with seam locations agreed with you in advance.

  • Lighting design

    Layered general, task and accent lighting on the right circuits and controls.

  • Continuity with the rest of the house

    Floor, trim profile and paint carried through so the kitchen does not read as a bolt-on.

Sequence

How the work runs

  1. 01

    Scope in context

    We look at the kitchen and at the rooms it touches, because that is what decides the real scope.

  2. 02

    Structure and service

    Engineering for any wall removal, load calculation for the appliance package.

  3. 03

    Design and selections

    Plan, elevations, cabinet schedule and a dated selections list with lead times.

  4. 04

    Permit and order

    Permit filed, cabinets and long-lead appliances ordered.

  5. 05

    Demolition and structure

    Selective demolition, beam or header set, inspected.

  6. 06

    Rough-in and board

    Mechanical, electrical, plumbing, inspections, insulation where needed, drywall.

  7. 07

    Install and punch

    Cabinets, template, surfaces, tile, appliances, trim, paint, punch walk.

Why it costs what it costs

Five things that move the number

  • Whether a wall moves

    Removing a bearing wall adds engineering, a beam, columns, footings and an inspection.

  • Slab or crawl

    Moving a sink on a slab means cutting and patching concrete. On a crawl space it is an afternoon.

  • Appliance package

    Induction, double ovens and a large hood can push an older panel past its capacity.

  • Cabinet line

    Stock, semi-custom and custom cabinetry span a very wide range for the same footprint.

  • Surface choice

    Laminate, quartz, granite and natural stone differ in both material and fabrication cost.

Questions

Kitchen remodeling: common questions

Occasionally, when the kitchen work involves structure or service capacity that suits our crews. If your project is purely cabinets, counters and finishes in one room, a dedicated kitchen specialist will usually be faster and cheaper than we are, and we would rather say that up front.

Plan on the full nine to sixteen weeks, because the room is unusable from demolition to appliance set. We help set up a temporary kitchen with a sink alternative, the refrigerator relocated and counter space, and we put the dates in the phase map.

That is exactly the question we run a load calculation for. A 100 amp service with an electric range, a dishwasher, a disposal, a microwave and new lighting circuits is frequently at its limit before you add anything else.

Sometimes, if the layout does not change under the cabinets and the floor is in good condition. Usually the run of new cabinets exposes where the old floor stopped, and continuing the floor is the better answer.

All frequently asked questions

Related

Usually bought together with

Start where every one of our projects starts

A two hour site visit, then a written budget band inside a week. No drawings, no deposit.